New plastered surfaces: Make sure the surfaces are dry, clean and free of dust and dirt.
Cracked surfaces: remove bricks and stones around the cracks, enlarge the cracks appropriately. then fill the cracks With a grooved filler, let it dry and smooth it with sandpaper. and clean
Surface with original color: Remove the original paint that has peeled off. With a scraping trowel or wire brush, if unsure of the condition of the original paint Peel it off with a tool. or Beyer paint remover Then clean thoroughly with high-pressure water jets. and leave to dry completely before painting.
Moldy surfaces: Remove algae, mold with scraping trowels or wire brushes followed by high-pressure water jets. Then clean the surface too. Beyer Mold Free Mold Free M-001
Step 2 Primer paint
In case of new cement surfaces or old cement surfaces with normal humidity values (humidity is lower than Approximately 20%), apply foundation as well. Begerlight Primer B-1999, 1 coat to increase the ability to adhere to the surface. and efficiency in protecting the occurrence of stains from salt
In case of new cement surfaces or old cement surfaces with higher humidity than normal (humidity range 20-35% approximately) or a surface that has accumulated moisture continuously. It is also recommended to apply Beyerlight Waterroof Primer No. 1012, 1 coat before applying topcoat.
Step 3 Topcoat paint
After applying the primer, allow it to dry for at least 24 hours. 2 coats of Beger Light 365, each coat should be left to dry for at least 24 hours.
First coat: Begerlight 365 should be diluted with approximately 10% Begerlight 365 Thinner M-91 for better penetration and adhesion. and make the color last longer
Second coat : Apply Beger Light 365 without dilution.